“We have a kitchen” is not the same as “we can fulfill 30 orders”: availability, skills, hours and constraints matter as much as ownership.

Resources and capabilities are different

A resource can be a person, equipment, facility, software, information, money or external service. A capability is the real ability to produce an outcome using resources, knowledge and processes together. A business may own an oven without being able to safely produce a specific number of meals: procedures, maintenance, staff or time may be missing. The business model capabilities guide covers strategic needs; here we focus on securing and scheduling those capabilities for execution.

List what exists and what each deliverable needs

Begin with the WBS. For each work package record resource type, quantity, skills, availability, operating condition, cost and owner. Mark whether it is owned, borrowed, rented or contracted. Do not confuse a verbal offer of help with confirmed availability.

Resource Pilot requirement Available Gap
Kitchen Produce 30 mock units Capacity not measured Production trial
Delivery Defined area and delivery window One part-time driver Confirm route and backup
Order entry Confirmation and follow-up Spreadsheet Test mistakes and recovery
Regulatory knowledge Identify applicable requirements Not officially confirmed Research authority and advice

Quantify availability and constraints

Where sensible, express capacity in units per hour, useful hours per week, available stations, vehicle trips, machine cycles or simultaneous orders. If one person has 20 available hours per week and three activities require 12, 10 and 8 hours in the same period, demand is 30 hours: 10 hours are overallocated even if each activity looks feasible on its own. Include time for coordination, training, interruptions and absences.

If one person is assigned to multiple outcomes, review the workload against the RACI matrix: they may need to execute some work while only approving or being consulted on other deliverables. Changing the letters does not create more available hours; activities or scope may still need adjustment.

A system's capacity is not simply the sum of its parts. A kitchen may make 40 lunches per hour while distribution can handle only 20 within the promised time window. The distribution process is then the constraint, subject to quality, distance and timing evidence. This feeds into duration estimates and the schedule.

Choose how to close a gap

For each missing resource compare training, hiring, outsourcing, buying/renting or shrinking the scope. Consider lead time, total cost, external dependency, quality, control and fallback. A cheaper option arriving after the needed milestone does not solve the problem. An external courier closes a capacity gap only when its commitments are confirmed; consult the supplier selection guide.

Critical resources may justify a proportionate backup. That does not mean contracting two suppliers for everything: prioritize what could halt the operation and connect the choice to the risk register.

Example and gap log

Suppose the goal is to deliver 30 lunches during a defined window while the current driver has an unverified capacity of 15. Options include reducing the pilot to 15, contracting help, widening the window (only if consistent with the promise), or changing the delivery area. None is declared workable until timing is measured. The log records requirement, current capability, shortfall, chosen option, assumption, cost, owner, required date and evidence of availability.

A measurable capability-gap closure plan

Inventory means more than saying “we have it”: check quantity, throughput, skill, schedule, quality, and availability when needed. A kitchen available for six hours does not guarantee 30 orders when the cook can prepare ten per hour and also needs time for cleaning and packing. Separate productive hours from paid hours.

Gap Pilot requirement Current assumed availability Closure option Owner / evidence
Delivery Ten orders inside the window Not tested Rehearse with one courier and short route Owner / time stamps
Kitchen capacity Thirty orders/day Twenty orders/day demonstrable Add a shift or reduce scope to 20 Cook / capacity test
Requirement research Locate official sources Authority unconfirmed Identify jurisdiction and consult Owner / official reference
Critical supplies Cover pilot needs One supplier Obtain and evaluate a backup quote Owner / comparable quotes

Compare buying, renting, hiring, outsourcing, training, or reducing scope in terms of total cost, preparation time, reversibility, and dependence. Equipment will not fix every capacity shortage: people, approvals, or routes can constrain the system. Two activities cannot claim the same scarce resource simultaneously without checking availability; otherwise, the critical path calculation understates the real schedule.

Beyond total cost, compare when cash must be paid and when customer receipts are expected using the cash-flow and reserves forecast. Buying equipment now and paying monthly rental fees may affect liquidity differently even when total costs appear similar.

Record owner, date required once actually set, quotation source, alternative, cost, and an observable closure criterion for each gap. If the capacity cannot be achieved, reduce the pilot and recalculate the startup budget. Never present illustrative assumptions as verified availability.

What you should have when you finish

An inventory of current resources, prioritized gaps, an acquisition or training plan and constraints affecting the launch date. Revisit the inventory whenever scope, staffing or suppliers change.